|
The ESP Unit Meets or Exceeds Standard Specifications such as:
|
|

|
V-Belt tensioning by total automatic tensioning system or take up rails.
|
|

|
Easily-removable, OSHA compliant drive guard.
|
|

|
Elevated steel base with interior sub-base.
|
|

|
Oil fills plumbed for ease of maintenance.
|
|

|
Inlet filter is integral to chamber/absorptive-type inlet silencer.
|
|

|
Discharge silencer is chamber-type.
(not integral to base frame for ease of maintenance and less noise)
|
|

|
Spring-loaded relief valve.
|
|

|
Flex Connectors for less vibration and sound transmission.
|
|

|
Sound enclosure of sheet steel or aluminum construction with sound attenuation of up to 23 db(A) with removable panels on front of unit for ease of maintenance.
|
|

|
Pressure and temperature gauges pre-piped and panel mounted on enclosure.
|
|

|
Filter differential gauges.
|
|

|
Blower package can be installed adjacent to another blower package & mounted next to wall.
|